AKS Ward London
Head Office
One West Smithfield
London
EC1A 9JU

020 7236 0161
020 7236 3239
london@aksward.com

Gary Allen / Director
Matt Walker / Technical Director
Roger Fisher / Company Secretary

View on Google Maps
AKS Ward Hitchin
Lister Beare
Manor Court, 26 Bancroft
Hitchin, Hertfordshire
SG5 1JW

01462 420 668
01462 438 630
hitchin@aksward.com

Roger Fisher / Director
Colin Seabrook / Technical Director
Michael Beare / Consultant.

View on Google Maps
AKS Ward Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA

02380 235 340
02380 634 294
southampton@aksward.com

David Perkins / Director
Brian Ritchie / Director

View on Google Maps
AKS Ward Oxford
Seacourt Tower
West Way
Oxford
OX2 0JJ

01865 240 071
01865 248 006
oxford@aksward.com

Craig Gamble / Director
Charles Soothill / Director

View on Google Maps
AKS Ward Birmingham
33a Vittoria Street
Birmingham
B1 3ND

01212 274 386
birmingham@aksward.com

Gary Allen / Director
Craig McFadyen / Technical Director

View on Google Maps

Who

We are construction consultants
who place an emphasis on
innovation  ,
design  , and sustainability  .

We have a team of 80
working closely with

clients  and their architects
to realise their vision.

What

We are experts in our field, our
services include
Structural
and Civil Engineering  ,  Historic Buildings,
Conservation  and Building Surveying.

We work on projects from small
and bespoke to construction values
in excess of £100 million.

Where

We have offices in:

With alliances that cover
the whole of the uk

Updates

Construction June 2016 01
10/06/2016

Marina & Berthing in Gibraltar

The construction of a new marina for small boats within Gibraltar Harbour is proceeding at an eager pace.

Read more

2016.February.MaryleboneA
10/06/2016

35 Marylebone High Street

Breaking ground commenced on this £27M development, during the third week of July 2015. The project has now almost reached the end of the second stage of construction; the foundations are complete, erection of the superstructure is in full swing and is finished up to the lower ground floor.

Read more

AKS Grey & Green with Green Ribbon
09/01/2017

IStructE Regional Rep

In the autumn of 2016 David Girling from our Oxford Office was successfully elected as Graduate Representative onto the Thames Valley Regional Group Committee for the Institution of Structural Engineers for the 2017 session.  He is looking forward to getting involved in the Regional Group activities, meeting engineers from across the region and hopefully building closer ties between AKS Ward and the Institution.

Press call 01a
16/01/2017

Trip to ConvegnoCalce16

Last December, Eleonora Putzolu of our conservation team in Hitchin, was invited to speak at an annual conference organized by the Italian Limes Forum in Aosta. ConvegnoCalce16 discusses the use and applications of lime mortar. She speaks in-depth about her experience:

Read more

17/01/2017

Studios, Arts University Bournemouth

The conversion of two former Student Accommodation Blocks to Academic Studios has been completed for Arts University Bournemouth following completion of Photography and Student Services Buildings.

Read more

On Site

Construction June 2016 01
10/06/2016

Marina & Berthing in Gibraltar

The construction of a new marina for small boats within Gibraltar Harbour is proceeding at an eager pace.

Read more

2016.February.MaryleboneA
10/06/2016

35 Marylebone High Street

Breaking ground commenced on this £27M development, during the third week of July 2015. The project has now almost reached the end of the second stage of construction; the foundations are complete, erection of the superstructure is in full swing and is finished up to the lower ground floor.

Read more

08/02/2017

Romford Leisure Centre Nearing Completion

Our Engineer, Alex Parry, has attended site to monitor progress on the eagerly anticipated Romford Leisure Centre site. The superstructure supporting the ice rink is nearing completion, and the pool excavation has begun.

The new multi-use four-storey leisure centre for Havering Council will provide state of the art facilities; a 25m eight-lane swimming pool with movable floor, learner pool, suspended ice rink with approximately 800 spectator seats, gymnasium, and cafe. The design posed interesting challenges. Ensuring the structure was robust enough to support the elevated ice rink (located above the main swimming pool) and working with specialists to determine all the details for temperature and vapour control between the extremely different environments required, was a real buzz.

A particular design challenge overcome by the design team involved construction of the new centre on the footprint of an existing building with piled foundations.

The project has recently been featured in New Steel Construction Magazine

Watch a time lapse video of the new construction by Havering Council

Architect: Saunders & Boston | Contractor: Wilmott Dixon

Steel 02
20/02/2017

PR Mention in NSC Magazine

A comprehensive dissection of the design process that went into the construction of the Romford Leisure Centre has been published in the New Steel Construction publication, which includes a quote from our Sophie Onoufriou (Project Engineer), and features a 3D model of the steel structure by our Martin Parker (Senior CAD Technician).