New 60-bed care home and sixteen shared equity affordable homes on a previously undeveloped site (former mill pond) that had very poor ground conditions. The project is constructed on a raised terrace above the flood plain that included flood compensation measures.
The superstructure is a combination of loadbearing masonry, steel framing and timber frame.
Our services were not restricted to the buildings but included a new access road from the A325 along with realignment of the A325 link from the busy A31. The onsite access road included culverts to maintain paths of the watercourses running through the site.