• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Hitchin
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

138 Park Lane

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

Restoration and refurbishment of a Grade II listed landmark building for the creation of four high end luxury apartments and two-storey retail unit below. Our structural engineers were involved in the overhaul of the internal elements including adding new floors and re-configuring of the apartments.

Our building surveyors were instructed to carry out the pre-acquisition survey and to comment on the existing condition of the property with a programme of repairs. We were then instructed as party wall consultants, CDM coordinators and as historic building consultants by way of specifying and overseeing the refurbishment including the treatment of lead in paint and wet and dry rot affected timber work, and external render works which involved removing all of the cracked render and replacing with new lime based render system as approved my Westminster Planning Department.

  • Status In-progress
  • Date 2015
  • Cost £3.5M
  • Role Building Surveying
  • Client Pedra
  • Architect Holder Mathias

AKS Ward is registered in England and Wales
Registration No. 5433208