• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Hitchin
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Blyth Road, Hayes

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

AKSWard was appointed to revive the project by assessing what had been built and modelling the rest of the building. The site is in Blyth Road, not far from Hayes and Harlington station and  consists of 120 flats, 97 of which are affordable.

The concrete frame for the three blocks was substantially completed and one of the blocks had windows and cement boarding installed. It was a challenging situation, with wide ranging uncertainties that needed to be overcome to allow the project to re-start. The structural and drainage remediation works of the building included strengthening the building and putting the correct drainage works in place.

AKSWard designed a remediation scheme that was both cost effective and would achieve the objective of the Blyth Road project.

  • Status Complete
  • Role Civil and Structural Engineering
  • Client Paradigm Housing Group
  • Architect Jefferson Sheard Architects
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes
  • Blyth Road, Hayes

AKS Ward is registered in England and Wales
Registration No. 5433208