• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Hitchin
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Crossrail

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

Crossrail is the largest infrastructure project in Europe.

AKS Ward is the Crossrail Party Wall Surveyor for Bond Street Eastern Ticket Hall site at Hanover Square, where a specific undertaking reapplies the Party Wall Act 1996 in its entirety for the benefit of a Grade II* listed property owned by Great Portland Estates.

For the remainder of this vast project, the Party Wall Act etc that normally would relate to excavation works is superseded by the Crossrail Act.

To avoid any disruption to the programme as and when the relevant information becomes available, the following works have been the subject of numerous awards:

  • demolition of the compulsorily purchased adjoining buildings
  • construction of temporary restraining structures
  • construction of the secant piled wall to a depth of 50m
  • all tunnelling
  • tunnelling enlargement for station platforms
  • cross passage construction
  • Status In-progress
  • Date 2018
  • Cost £178BN
  • Role Party Wall Surveyors
  • Client Crossrail
  • Architect N/A

AKS Ward is registered in England and Wales
Registration No. 5433208