• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Village School, Brent

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

This entirely new school replaces existing schools which occupied the site, offering special educational needs to pupils aged four to nineteen.

To overcome the sloping site, the building has a split ground floor level with RC retaining walls to the internal courtyard.

RC flat slabs used throughout with exposed concrete columns in several communal spaces.

Given site constraints, part of the roof has been designed as an outdoor space for the pupils to use.

The main elevation has a double height steel canopy to offer solar shading.

  • Status Complete
  • Cost £21M
  • Role Structural Engineering, Civil Engineering
  • Client Bouygues
  • Architect Frankhams Consultancy

AKS Ward is registered in England and Wales
Registration No. 5433208