• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Hitchin
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Christchurch Hospital, Christchurch

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

Procured under P21+ this Christchurch Hospital project involved the regeneration of the hospital site which dated from the late 19th Century and had undergone significant addition and modernisation during the 1960s and 1970s along with a significant number of alterations since.

A Masterplan was produced for the site which saw removal of the original 1890s ward blocks along with single storey 1960s ward blocks, consolidation and rejuvenation of the 1960s clinical buildings and the addition of a curved wrap around building housing a new GP Surgery, Pharmacy and Imaging.

Christchurch Hospital site infrastructure was redesigned to accommodate potential future development and involved significant road re-alignment and drainage works following detailed flood risk assessment and production of a drainage strategy allowing for future growth plans.

  • Status Complete
  • Date 2017
  • Cost £12m
  • Role Structural Engineering
  • Client RBCH
  • Architect Studio Four Architects
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital
  • Christchurch Hospital

AKS Ward is registered in England and Wales
Registration No. 5433208