• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Marina and Superyacht Berthing, Gibraltar

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

The Government of Gibraltar appointed GJB Ltd, a Gibraltar based contractor, to undertake the design and construction for a new marina capable of accommodating 700 boats with lengths of up to 9.0m. The new harbour also provides berthing facilities for superyachts up to 165m long. The construction has been formed within the existing port in an area protected by new concrete caisson units which are slip-formed by a specialist contractor then towed into position before being sunk.

The project included the construction and installation of these new caissons, associated breakwaters, a new access deck, and floating pontoons within the marina to provide the required moorings.

Working closely with AKS Architects & Engineers, AKS Ward were responsible for the civil and structural engineering design of the fixed and non-specialist elements of the works.

  • Status Complete
  • Date 2016
  • Cost £25M
  • Role Structural Engineering, Civil Engineering
  • Client Government of Gibraltar
  • Architect

AKS Ward is registered in England and Wales
Registration No. 5433208