• Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
Subscribe
  • Home
  • About
  • Climate Action
  • Our Projects
  • Our Team
  • News
  • Careers
  • Appointment
  • Contact
  • London
  • Southampton
  • Oxford
AKSWard London
Head Office
10 Bonhill Street
London
EC2A 4PE
020 7236 0161
london@aksward.com
Gary Allen / Managing Director
Matt Walker / Head of Building Surveying
Stephen Gibbs / Operations Director
View on Google Maps
AKSWard Hitchin
7 Bancroft
Hitchin, Hertfordshire
SG5 1JQ
01462 420 668
hitchin@aksward.com
Gary Allen / Managing Director
Colin Seabrook / Head of Conservation
View on Google Maps
AKSWard Southampton
116 High Street
The French Quarter
Southampton
SO14 2AA
02380 235 340
southampton@aksward.com
David Perkins / Director
John Dunford / Regional Director
View on Google Maps
AKSWard Oxford
Registered Office
Seacourt Tower
West Way
Oxford
OX2 0JJ
01865 240 071
oxford@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps
AKSWard Birmingham
33a Vittoria Street
Birmingham
B1 3ND
01212 274 386
birmingham@aksward.com
Craig Gamble / Director
Paul Morgan / Operations Director
View on Google Maps

Mayflower Theatre

Read More

Sectors

  • All
  • Commercial
  • Education
  • Residential
  • Industrial
  • Leisure & Culture
  • Health & Care
  • Retail
  • Public Sector
  • Heritage & Conservation
  • Transport & Infrastructure
  • Regeneration

Services

  • All
  • Structural Engineering
  • Civil Engineering
  • Building Surveying
  • Conservation Engineering
  • Party Wall Surveying
  • Highways Engineering

Case Studies

  • The Somerstown Community Hub, Portsmouth
  • Unison HQ, London
  • Kings Cross, London

AKSWard was appointed as the structural engineer for both internal and external alterations of the Grade 2 Listed Mayflower Theatre in Southampton. Constructed in the 1920’s it is the largest theatre on the South coast and attracts a steady stream of shows on tour from the capital.

Our input for the internal alterations was focused on remodelling and enlarging the orchestra pit along with the introduction of new strong points in the roof void to support services and lighting rigs. Due to limited access, the steel trusses providing the strong point supports were designed to be transported in small sections and assembled within the roof void.

A new 4-storey extension was also added principally storage use, with a bridge link connecting into the existing offices and extending to the new green room constructed on the roof of the existing multi-storey office block at the rear of the complex. The new structure is a steel frame with concrete metal deck and masonry cladding.

The extension was constructed on piled foundations on the same footprint as a former single storey extension adjacent to the original 1920’s foundations. Services in the area were maintained live throughout the project further adding to the complexity of the design and construction.

The project ran to a restricted construction programme largely contained within the theatre’s ‘dark’ period. AKSWard’s close working relationship with the contractor to provide simple, economic solutions were instrumental in the success of the project.

Photography: Mayflower Theatre

  • Status Complete
  • Date 2018
  • Cost £7.5m
  • Role Structural Engineering
  • Client Mayflower Theatre
  • Architect Foster Wilson Architects

AKS Ward is registered in England and Wales
Registration No. 5433208