Dramatic remodelling and re-cladding of 1980s reinforced concrete-framed building to form a contemporary style headquarters office building of 80,000ft ².
The dated pitched roofs were demolished, and a striking fourth quadrant was constructed to form the bold and dramatic new entrance, relocating the main core as construction extended to the rear to avail more floor space.
The new quadrant was constructed in metal deck formed concrete and with a steel composite makeup.